Work Breakdown Structure Scheduling for Repetitive Construction Projects with Soft Logics
Journal: International Journal of Science and Research (IJSR) (Vol.6, No. 3)Publication Date: 2017-03-05
Authors : Lekshmi A L; T R Sethu Raman; Sreeja V;
Page : 658-662
Keywords : Construction scheduling; Repetitive projects; Soft logics; Work breakdown structure; Primavera P6;
Abstract
Construction site condition often deals with situation that the preplanned work pattern has to be changed. But due to the lack of knowledge about the after effect of that change the work team hesitates to do so. This paper presents a work breakdown structure for scheduling repetitive construction projects with soft logics. Soft logics relations are non-fixed work sequence which can be reordered for getting changes in cost, duration and resources usage. With the help of soft logic consideration in work breakdown structure of repetitive construction projects the site working team can find the after effect of change in work pattern through various sequence of the proposed work. Primavera P6 software makes it easier to apply that change and also to track the overall progress of the work. Final result clearly shows that planning the work in different pattern, before execution, will help the project manager to select an optimum sequence of work breakdown structure.
Other Latest Articles
- Novel Numerical Solution of Schrodinger Equation for Hydrogen-like Atoms
- Antibacterial Evaluation of Common Bacteriological Profile (Aerobic) in Acute Exacerbation of Chronic Obstructive Pulmonary Disease (AECOPD) in Tertiary Care Hospital (Silchar Medical College&Hospital)
- Effect of Myofascial Release and Deep Transverse Friction Massage as an Adjunct to Conventional Physiotherapy in Case Unilateral Upper Trapezitis -Comparative Study
- Correlation between Hand Grip Strength and Hand Eye Coordination with Performance in Adolescent Tennis Players
- Research and Design of AGV System Application Based on PLC and RFID
Last modified: 2021-06-30 18:07:59