A Parametric Programming Problem for Selecting the Optimal Scheme of Waiting Time of the Stuffs for Work
Journal: International Journal of Science and Research (IJSR) (Vol.6, No. 5)Publication Date: 2017-05-05
Authors : Jang-Ryol; Ri Chol-Ryong; Kim Yong;
Page : 2485-2500
Keywords : Discrete parametric min-max problem; Optimal control technique of filming process; Alternative production organization; Variable supply constraints of resources; cutting in multiple processing technique of software;
Abstract
In this paper, we propose a discrete parametric programming problem in which the feasible region is a set of the waiting time schemes, and beginning and closing times of the stuffs for work are alternated strictly with an invariable ratio (parameter). The objective function is represented by min-max operator. We study change of feasible region and minimum of the objective function according to change of the parameter. Moreover we study relations of the parametric programming problem and a multi-objective problem.
Other Latest Articles
- Synthesis with Structural and Morphological Study of n-Cu2O Layer Produced by Immersion, Boiling and Chemical Bath Heating Techniques of Electroless Deposition Method
- Correlation between Fasting Blood Glucose and HbA1c in First Degree Relatives of Sudanese Diabetic Patients as a Predictor of Type 2 Diabetes Mellitus
- How Clean is the University Teaching Hospital Phase III Theatre Tap Water in Zambia for Use in the Orthopaedic Wound Irrigation
- A Survey of Image Enhancement Techniques
- Fuzzy Search Engine for Cloud Encrypted Data
Last modified: 2021-06-30 18:55:25