Integrated Land and Ecosystem Management of Sindh River Catchment Area
Journal: International Journal of Science and Research (IJSR) (Vol.2, No. 10)Publication Date: 2013-10-05
Authors : Surendra Kumar Gupta;
Page : 207-209
Keywords : MGNREGA; Watershed; Water Budget; River Revival;
Abstract
Integrated land and ecosystem management of river revival project is a multipurpose project of Sindh River. The catchment area of the river is 16283 hectare meter and selected length is 22 km which is spread in 23 villages of 7 GP's and one Nagar Panchayat Lateri (Town area) at Lateri block in Vidisha district of Madhya Pradesh. Effective results have been seen such as the availability of enough water in hand pumps, bore wells and other water bodies in the catchments area of Sindh River. This is due to the increased availability of water resources, diversified cropping pattern including cultivation of labor intensive fisheries ponds, vegetable crops and other horticultural crops (Reddy et al, 2004).
Other Latest Articles
- Karanja Oil as an Alternative Fuel for Direct Injection CI Engine- A Review
- Sentiment Analysis of Micro blogs using Opinion Mining Classification Algorithm
- Comparative Study on Dysfunctional Attitudes among Parents having Children with Intellectual Disability and without Intellectual Disability
- Temporal Topic Summarization and Content Anatomy Based on Ontology Method
- Cache Consistency in Mobile Ad-hoc Networks with SSUM
Last modified: 2021-06-30 20:22:17