Performance Evaluation of Bhabour Sahib Medium Irrigation Project
Journal: Asian Journal of Advanced Basic Sciences (Vol.2, No. 2)Publication Date: 2014-07-31
Authors : H. P. Singh; M. R. Sharma;
Page : 59-65
Keywords : Lift irrigation project; main stakeholders; cultivable command area and NPSHA;
Abstract
India is amongst the largest irrigator countries in the world today. There is however, increasing concern about some of the irrigation potential created not brought into the functional use. System performance monitoring evaluation and diagnostic analysis are keys to appreciate the improvement or inefficiency in our irrigation projects. Therefore, exercise of performance evaluation of an irrigation system, whether a minor irrigation system or a medium/major irrigation project, requires proper understanding of the problems and potentials of that project. The potential utilization of Lift Irrigation Project Barbour Sahib is less than the average of District Una and even that of State of Himachal Pradesh.
Other Latest Articles
- Employees Performance Appraisal and its techniques: A Review
- Potentiometric determination of Stability Constant of Levofloxacin and Mn (II) Ion Complex
- Synthesis and Characterization of 2H-Pyrrole-2-Ones of (5-Benzoyl-benzoimidazol-1-yl)-acetic acid hydrazide derivatives
- Different Aspects of Intercultural Nonverbal Communication: A Study
- Experimental studies of Azo Schiff Base Chelates and their Corrosion Inhibition Behavior
Last modified: 2015-01-28 15:44:08