Solid Waste Management in PCMC (3R's Principle)
Journal: International Journal of Science and Research (IJSR) (Vol.4, No. 5)Publication Date: 2015-05-05
Authors : Niraj Burge; Sunil Gangurde;
Page : 476-481
Keywords : Solid Waste Management; 3R-s Cycle; Route Cost optimization; MSW; collection efficiency;
Abstract
Solid waste is inevitable task in urbanization process and it will increase in future. The collection, segregation, storage, transports and processing of solid waste needs planning and more investment. India is experiencing tremendous growth in urban areas which produce 120, 000 tonnes of solid waste per day. Some metropolitan cities like Mumbai, Calcutta, Bengaluru, and Pune showing typical urban pollution. Among these Pune is also one of the cities which produce large quantity (1000-2000 MT/day) of Municipal Solid Waste (MSW). Study involves the Solid waste Management system in PCMC (Pimpri Chinchwad Municipal Corporation). Prepare and submit an action plan of 3R cycle to PCMC regarding Solid Waste Management which gives maximum collection efficiency and route cost optimization. The methodology involved locating the bin positions, mapping collection points and routes of vehicle, assessing waste characteristics through sampling.75 percent of total waste can be reduced from going to landfill by practicing 3R's. This will not only reduce pollution caused by dumping but also make today-s waste as tomorrow-s resource.
Other Latest Articles
- A New Transfer Technique (San Technique) of CAD/MAM Surgical Guide for Prosthetic Driven Implant
- Enhancing Security of Database Stored in Cloud Environment
- Regulation of Combined Harvesting of an Inshore-Offshore Fishery by Taxation
- Reconfigurable FPGA Implementation of FIR Filter using Modified DA Method
- Position Control of Hybrid Stepper Motor Using PIC16F877A Microcontroller
Last modified: 2021-06-30 21:46:31