Lead Time Reduction In Camshaft Manufacturing
Journal: International Journal of Science and Research (IJSR) (Vol.4, No. 5)Publication Date: 2015-05-05
Authors : Govind Janakiram K; Gukan Rajaram;
Page : 968-972
Keywords : Camshaft; Value stream mapping; Lean production tools;
Abstract
This project is aimed at lead time reduction in camshaft value stream. Camshaft is an A class component which is an integral component of the diesel fuel injection pump. It is made up of forged steel or cast iron material. It consists of cams which operate the plunger of a fuel injector. Through this project we aim to reduce the response time, space optimization, delivery fulfillment, improve flexibility and inventory control by use of value stream mapping and other lean production tools. This project also leads to reduction of number of associates, floor space and material movement by a considerable amount.
Other Latest Articles
- Failure Investigation of Tawila Dam in North Darfur, Sudan
- Effect of IAA and IBA on In vitro Rooting of Banana (Musa paradisiaca) Cv.Grand Naine
- Condition Monitoring of 3-? A.C Induction Motor Using PLC
- Applying Utaut to Evaluate the Acceptance of Mobile Learning in Higher Education in Iraq
- Analysis of Ambattur Lake Water Quality with Reference to Physico ? Chemical aspects at Chennai, Tamil Nadu
Last modified: 2021-06-30 21:46:31