All Path Algorithm for CPM Networks
Journal: International Journal of Science and Research (IJSR) (Vol.4, No. 8)Publication Date: 2015-08-05
Authors : Kuldeep Singh Kushwah; Sanjay Tiwari;
Page : 876-878
Keywords : CPM;
Abstract
Time Cost Trade-off refers to expedite some selected activities in a project to complete it an earlier deadline than its normal project duration. Mathematical formulation is presented for TCT in this paper. Paper discusses in detail the procedure of exploring all paths in project network. All paths need to be explored in TCT analysis as the constraint is that time wise all path length shall not exceed desired due date duration.
Other Latest Articles
- Adsorption Characteristics of Co(II) Onto Ion Exchange Resins 1500H, 1300H and IRC 86: Isotherms and Kinetics
- The Effect of Resistance Training and Swiss Ball Resistance Training on Balance among Male Handball Players
- Performance Analysis of Cryptographic Hash Functions
- Achievable Throughput Optimization in Turbo Coded OFDM Systems and its Application to Power Line Networks
- Implementation of LTE Networks in Indian Terrain: Practicality and Throughput Evaluation
Last modified: 2021-06-30 21:52:09