Optimization of Pipe Finning Process with Engineering Principles

Journal: International Journal of Science and Research (IJSR) (Vol.5, No. 3)

Publication Date:

Authors : ; ; ; ;

Page : 270-272

Keywords : CAD; 5S; PDCA; Trolley;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

Industrial development depends on total process time of each process and investment on the same i. e mass is the production vast is the output. Thus by reducing time between processes with minimum use of manpower, electricity can bring rise in total output and profit. This paper shows an overview of use of 5s principle for arranging a layout and design principles to built a trolley. With reduced cycle time, backtracking we have optimized the process. Application of trolley between to process can achieve our purpose of reduced cycle time, we can monitor movement of assemblies and product between different stations. Material handling time is one of the concern in many industries like us, so by using simple design trolley can be major outbreak. Our benchmark has been a less space consuming, easy to handle and more resistant trolley.

Last modified: 2021-07-01 14:32:41