Estimating Rock Mass Parameters in Block and Matrix Rocks in Devoll Valley
Journal: International Journal of Science and Research (IJSR) (Vol.5, No. 4)Publication Date: 2016-04-05
Authors : Megi Rusi;
Page : 1417-1420
Keywords : strength; deformability; GSI; UCS; mi constant;
Abstract
Devoll Hydropower Project in Albania consists of 3 power plants stretching from the village of Maliq to Banja. For the construction of Moglice hydropower, which is the upstream plant of the cascade, a 11 km headrace tunnel is planed from Moglice dam to Grabove underground powerhouse. Approximately 700-800 m of the tunnel will cross through heterogeneous rock masses consisting of different lithology blocks embedded in a fine grained sheared matrix. Estimating the rock mass parameters of this section for tunnelling purposes has been challenging and different methods of classification have been used. The paper at hand will describe the estimation of strength and deformability parameters of the rock mass through the usage of Hoek and Brown Criteria and RocLab software. A comparison will be made with the laboratory tests results to evaluate the effectiveness of the method.
Other Latest Articles
- 2- Dominator Coloring for Various Graphs in Graph Theory
- The Report on Endemism of Liver Cancer in Indian Subcontinent-A Reterospective Study
- A Curious Case of Total Anomalous Pulmonary Venous Connection
- Evaluation of Adiponectinin Patients with Type 2 Diabetes Mellitus in Erbil City
- Biological Influence on the Mobility of Metals from Mine Tailing Dump Located in Krugersdorp Area
Last modified: 2021-07-01 14:33:56