Method to Assess the Level of Implementation of Productivity Practices on Construction Projects
Journal: International Journal of Science and Research (IJSR) (Vol.5, No. 6)Publication Date: 2016-06-05
Authors : Vikram S. Gohatre; Amitkumar B. Ranit;
Page : 169-184
Keywords : Labor productivity; Project planning; Management practices; Industrial projects; Implementation index;
Abstract
It is unfortunate that the productivity in the construction industry has lagged behind the manufacturing industry for the last several decades. The research presented in this thesis aims to improve productivity in the infrastructure sector of the construction industry by developing Best Productivity Practices Implementation Index (BPPII) for Construction projects. The BPPII Infrastructure is a check list of practices that are considered to have a positive influence on labour productivity at the project level for infrastructure projects. These practices have been identified through a literature review and consultation with industry experts, and have been anecdotally proven to positively affect productivity. These practices have been grouped together into a formalized set of BPPIIs categories, sections, and elements. Its planning and implementation levels have been defined. Each practice in the index has been assigned a relative weight based on its importance in affecting labor productivity. In total, there are 31 elements and 6 categories. The six categories of the BPPII Infrastructure are (1) Materials Management, (2) Construction Machinery and Equipment Logistics, (3) Execution Approach, (4) Human Resources Management, (5) Construction Methods, and (6) Health and Safety. The PIL method is used to find maximum score of each category and each element. Further the category are ranked on the basis of the score obtained by the PIL. The category Execution Approach score the highest in all the category with the score of 146. Further the top 10 element are ranked according to the their score.
Other Latest Articles
- Empirical Model for Fault Prediction On the Basis of Regression Analysis
- Metrics Threshold Analysis On the Basis of Clustering Technique for Fault Prediction
- Randomized Controlled Study of Intravenous Regional Anaesthesia for Forearm & Hand Surgery: Comparison of Lignocaine, Lignocaine with Ketamine & Lignocaine with Dexmedetomidine
- Load Assessment/Evaluation of a Three Phase Four Wire Distribution System of a Technical Institution. A Case Study of Kumasi Polytechnic, Ghana.
- Genetic Algorithm for Resource Constrained Project Scheduling
Last modified: 2021-07-01 14:39:08