Multiple Resource Leveling using Re-Modified Minimum Moment Method to Construction Project
Journal: International Journal of Science and Research (IJSR) (Vol.5, No. 6)Publication Date: 2016-06-05
Authors : Lokendra Magendra; Sudhanshu Pathak;
Page : 332-335
Keywords : Resource rate; Resource Leveling; Re-Modified Minimum Moment Method; Primavera;
Abstract
A Project Manager frequently comes across two types of situations time constraints and resource constraints. A project requires resource to execute the activities. These resources include labor, equipment and materials required to complete the work. In the ideal world, resources are unlimited but in the real world they are generally not unlimited and the project team needs to level out the consumption of resource. The purpose of this paper is to apply Re-modified minimum moment method for multiple resource leveling to a construction project and resource leveling by using primavera project management software for the same project and to determine the optimum solution. The method is based on critical path method. To achieve the objective, data of construction of a residential tower is taken. It has been observed that Re-modification minimum moment gives optimum solution than primavera software.
Other Latest Articles
- The Extension Services of the Ifugao State University, School Year 2012-2015: Basis for a Community Enhancement Program
- Comparative Study of Pre and Post Monsoon Water Quality in and Around Gandhidham, Kachchh, Gujarat, India, for the Year 2015
- Planned Teaching v/s Self Instructional Booklet on Knowledge & Practice of Prevention & Post Exposure Prophylaxis of NST
- The Research Status of Bearing Seal of Cone Bit at Home and Abroad
- Study on Optimum Structural Design of Roller Bit Bearing Double Rubber Ring Seal
Last modified: 2021-07-01 14:39:08