ResearchBib Share Your Research, Maximize Your Social Impacts
Sign for Notice Everyday Sign up >> Login

Planning, Scheduling and Allocation of Resources for Multi storeyed Structure using Primevera Software

Journal: International Journal of Trend in Scientific Research and Development (Vol.5, No. 4)

Publication Date:

Authors : ;

Page : 1293-1299

Keywords : Planning; Scheduling; Tracking; Project Planning Software; Primavera P6;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

Any development undertaking regardless beginnings with the Layout of the structure or construction followed by Design and Analysis of the construction which is prevailing by cost assessment and making arrangements for the said project. This undertaking includes the format, plan, examination, arranging and cost assessment of a G 4 private structure situated in BicholiMardana, Indore. Primavera P6 has been utilized for arranging the different exercises that encompass the development of a structure. Utilizing primavera we had the option to detail a functioning timetable and furthermore an advancement bar for steady checking of the venture. Utilizing primavera we had the option to allot different assets just as obligations on different individuals identified with the different phases of the venture there by expanding responsibility. The term of the venture utilizing primavera has been determined to be around 374 days which likewise incorporates occasions. The advancement and the connection between different exercises has likewise been appeared as an enlivened Gantt Chart. This graph likewise helps the Project supervisor to disclose to his customers the different perspectives just as progress of the undertaking. The quote for the venture has been determined utilizing Center Line Method in Microsoft Excel. For the Abstract expense CPWD Schedule of rates has been followed and an absolute expense of Rs 5,733,000 has been determined. Nitin Mukesh Bhalla | Mr. Ravindra Raj "Planning, Scheduling and Allocation of Resources for Multi-storeyed Structure using Primevera Software" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-5 | Issue-4 , June 2021, URL: https://www.ijtsrd.compapers/ijtsrd42599.pdf Paper URL: https://www.ijtsrd.comengineering/civil-engineering/42599/planning-scheduling-and-allocation-of-resources-for-multistoreyed-structure-using-primevera-software/nitin-mukesh-bhalla

Last modified: 2021-07-13 17:16:00