Analysis of Factors Affecting the Delay of Lecture, Laboratory and Auditory Building Development Projects
Journal: International Journal of Scientific Engineering and Science (Vol.5, No. 7)Publication Date: 2021-08-15
Authors : Ruli Saefudin; Lalu Mulyadi; Tiong Iskandar; Lies K Wulandari;
Page : 1-4
Keywords : ;
Abstract
The results of regression analysis using SPSS that are dominant include the largest coefficient value of 0.196 on environmental variables (X7) and from the results of simultaneous regression model hypothesis testing F count > F table (5.633 > 2.390) and t test > t table (4,580>1,699) and Ho is Rejected and H1 is accepted. And the second largest coefficient value is 0.196 on the Human Resources variable (X3) and from the results of simultaneous regression model hypothesis testing F count > F table (5.633>2,390) and t-test > t table (4,580>1,699) a decision can be made Ho is Rejected and H1 is accepted. The strategy that must be carried out is to make Tribune Molds, Make Roof Frameworks and make Frames, Doors, and Glass Molds outside the project work area. Immediately make a framework of reference (KAK) as well as with a more complete and thorough planning so that it is on time
Other Latest Articles
- Integrated of Organic Manures and Inorganic Fertilizers was Effecive for Yield, Component Yield and Quality of Landrace Rice on An Giang, Vietnam
- Introduction of Feed Technology in Support Development of Beef Cattle
- Investigation of Inhibitory Potential of Monkey Cola (Cola Milleni) against some Microorganisms
- DETERMINATION OF ANIMAL LOAD AND GRAZING SYSTEM IN THE WEIGHT GAIN OF BOVINES WITH SECONDARY VEGETATION FEEDING
- NEW MEDIA IN THE CONSTRUCTION OF PRINTING MEDIA JOURNALIST
Last modified: 2021-09-04 22:16:09