Analysis of Factors Affecting the Delay of Lecture, Laboratory and Auditory Building Development Projects

Journal: International Journal of Scientific Engineering and Science (Vol.5, No. 7)

Publication Date:

Authors : ; ; ; ;

Page : 1-4

Keywords : ;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

The results of regression analysis using SPSS that are dominant include the largest coefficient value of 0.196 on environmental variables (X7) and from the results of simultaneous regression model hypothesis testing F count > F table (5.633 > 2.390) and t test > t table (4,580>1,699) and Ho is Rejected and H1 is accepted. And the second largest coefficient value is 0.196 on the Human Resources variable (X3) and from the results of simultaneous regression model hypothesis testing F count > F table (5.633>2,390) and t-test > t table (4,580>1,699) a decision can be made Ho is Rejected and H1 is accepted. The strategy that must be carried out is to make Tribune Molds, Make Roof Frameworks and make Frames, Doors, and Glass Molds outside the project work area. Immediately make a framework of reference (KAK) as well as with a more complete and thorough planning so that it is on time

Last modified: 2021-09-04 22:16:09