A FAST DYNAMIC PROGRAMMING ALGORITHM FOR STOPE BOUNDARY LAYOUT FOR UNDERGROUND MINE
Journal: International Journal of Advanced Research (Vol.9, No. 9)Publication Date: 2021-09-14
Authors : Sakirudeen A. Abdulsalaam;
Page : 86-90
Keywords : Algorithm Optimal Stope Dynamic Programming Ore Body;
Abstract
We developed an efficient algorithm that generates optimal stope layout for an underground mine. After a mining site has been identified and an exploration has been done, the data gathered is analysed and a modelling technique is applied to produce an ore body. The ore body is divided into thousands of mining blocks in three dimensions. The blocks are assigned values per tonne. The miners desire a stope layout which maximizes the mine value. In this paper, we present a fast algorithm that generates the stope layout efficiently without violating the physical constraints.
Other Latest Articles
- INVESTIGATION OF SIGNAL THRESHOLDING EFFECTS ON THE ACCURACY OF SOUND SOURCE LOCALIZATION
- AN EVALUATION OF READING KNOWLEDGE AND LINGUISTIC READING SKILLS ACHIEVEMENT OF GRADE1 LEARNERS IN SIX SCHOOLS OF MILENGE DISTRICT OF LUAPULA PROVINCE ZAMBIA
- IMPACT OF INFLATION ON THE COST OF LIVING IN INDIA
- COMPLETE LOCOMOTION ANALYSIS OF A SMALL DIFFERENTIALDRIVE MOBILE ROBOTIC PLATFORM
- THE ROLE OF EDUCATION IN NEEDS ASSESSMENT FOR SELF-ACTUALIZATION AND SELF-TRANSCENDENCE IN JUVENILE DELINQUENTS
Last modified: 2021-09-24 21:20:57