Provide a model for managing claims regarding the PMBOK standard
Journal: International Journal of Innovation in Engineering (IJIE) (Vol.1, No. 2)Publication Date: 2021-07-06
Authors : Farshad Shirazi;
Page : 63-72
Keywords : Change; Claim; PMBOK; Contracts;
Abstract
Iran is very rich in oil and gas, which is why the Iran government is investing billions of dollars every year in oil and gas facilities to improve the country. The oil and gas refinery construction industry are very complex and involves multidisciplinary contributors. In this environment, many changes and claims appear. Changes and claims are commonly considered negative events, and thus, should be kept away from the project. With considering this concept, this paper presents the results of a study of the types and causes of project claims in the Persian Gulf Star Gas Condensate Refinery project in Bandar Abbas. The data were analyzed and the consequences of this analysis along with advice on how to reduce/prevent claims in construction are then presented.
Other Latest Articles
- Robust Box Approach for Blood Supply Chain Network Design under Uncertainty: Hybrid Moth-Flame Optimization and Genetic Algorithm
- Provide a multi-purpose fuzzy model for stock portfolio optimization
- Providing a model for the issue of multi-period ambulance location
- A fuzzy solution approach with genetic algorithm for a new fuzzy queue multi-objective locating model with the possibility of creating congestion for health centers
- Investigating Iran Housing Market Cycles and Possible Scenarios in Short-Term and Midterm Horizon Using the System Dynamics
Last modified: 2021-10-18 00:13:19