ResearchBib Share Your Research, Maximize Your Social Impacts
Sign for Notice Everyday Sign up >> Login

IMPROVING PRODUCTIVITY BY REDUCING WASTAGES IN MANUFACTURING PROCESS

Journal: International Journal of Mechanical and Production Engineering Research and Development (IJMPERD ) (Vol.11, No. 5)

Publication Date:

Authors : ; ;

Page : 89-100

Keywords : Value Stream Mapping (VSM); Lean Tools; Value Added Time; Non Value Added Time; Productivity & Wastages;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

This project aims to reduce the wastages and the overall lead time in the manufacturing process for one of the crankshaft industries using Value Stream Map (VSM) and some other lean tools. It also aims to reduce the non-value-added activities in the manufacturing line to make the line more effective and to keep the production al igned. Here we have used Value Stream Map. First, the manufacturing line data was collected from the industry. Then current state map was drawn. By analyzing the current state map, non-value-added activities were identified which also includes some types of wastages. The wastes which we identified were the unnecessary motion of the component as well as the worker, inventory pile up and excessive scrap generation, rework on the component. The leans tools were used to reduce these wastes. The tools which we used are Kaizen, Poka Yoke, and some other quality tools. A future state map was drawn with the new and improved processes. This ensures that the processes are more effective and efficient. The result of this project was excellent as we were able to increase the process ratio by 8.69%. Therefore it is effective to use lean tools on the manufacturing processes in the industries.

Last modified: 2022-01-24 14:05:30