MODIFICATION MANAGEMENT FOR CONSTRUCTION PROCESSES
Journal: International Journal of Advanced Research in Engineering and Technology (IJARET) (Vol.10, No. 4)Publication Date: 2019-07-05
Authors : Ramesh Kumar R Nithya Maria Josephine Aparna LN Janani Selvam Jeganathan M;
Page : 234-245
Keywords : construction processes; process modeling; subsequent modifications;
Abstract
This paper presents an approach to handle different types of subsequent modifications in con- struction processes. It is focused on a formalized approach with the objective that effects of subsequent modifications are detected automatically. The approach presented in this paper makes use of an existing modeling technique specifically focused on construction processes. The modeling techniques result in a process description where all technological interdependencies between construction activities are consid- ered and where consistency between the sequence of activities and the history of components is guaran- teed. This modeling technique is expanded by an existing concept for handling versions and dependencies between objects. The integration of these different concepts makes it possible to track effects of relevant types of subsequent modifications in construction processes on a formalized basis. Effects of subsequent modifications are detected by algorithms, different versions can be compared by algorithms and different versions are stored so that subsequent modifications are documented. The innovation of the approach pre- sented is the completeness. Effects of different relevant types of subsequent modifications in construction processes are tracked on a formalized basis
Other Latest Articles
- STRATEGIES IN TEACHING ENGLISH GRAMMAR
- EFFECT OF HYDROGEN BOND ON MESOMORPHIC PHASES OF BINARY LIQUID CRYSTAL COMPLEXES
- STRENGTH AND DEFORMATION OF AXIALLY LOADED FIBER-REINFORCEDPOLYMER SHEET CONFINED CONCRETE COLUMNS
- PREDICTING USERS IN BROWSING BEHAVIOUR FOR WEB USAGE MINING USING FCM CLUSTERING
- VIBRATION CONTROL OF HELICOPTER USING ANTI-RESONANCE ISOLATION SYSTEM (ARIS)
Last modified: 2022-04-08 18:18:43