Renovation cycle diagram
Journal: Вестник МГСУ / Vestnik MGSU (Vol.16, No. 08)Publication Date: 2021-08-30
Authors : Kievskiy Leonid V.; Kievskiy Yakov I.;
Page : 1088-1094
Keywords : renovation; multi-rhythmic flow; cyclogram; efficiency;
Abstract
Introduction. A relatively new form of transformation of the territory in the current urban development, the renovation of quarters, requires close scientific study and methodological justification. Renovated neighborhoods, as well as projects for the construction of new houses, have individual features and characteristics. The authors hypothesize that, despite the variety of characteristics of renovated neighborhoods and projects for the construction of new houses, traditional in-line construction with the allocation of characteristic stages is possible. Materials and methods. To study the actual duration of the stages of creating objects under the renovation program (which is necessary to identify objects of similar duration), a special database was formed in the Scientific and Project Center “City Development”. As of 15.05.2021, 313 objects involved in the renovation program are included in this special database. A thorough verification of the specified database was performed. As a result, 122 objects with a spread of construction duration values from 11 months to 43.2 months are stored in the verified database. In addition, the materials of the information system for ensuring urban planning activities (ISOGD) of Moscow were used. The initial materials allowed us to identify a number of characteristic stages in the renovation program for each object. Results. To analyze the design duration of construction, the set of objects is divided into 2 parts: commissioning in 2021 and commissioning in subsequent years. For each part, histograms of the distribution of the duration of construction of houses during renovation are constructed and it is proved that the law of normal distribution is observed. A schematic model of renovation processes with multiple process durations is presented. The overall duration of the design (project stage) can take 1 year, construction — 2 years, and the combined stages: preparation of documents, relocation and demolition, will approximately take 1 year. This four-year wave cycle is then repeated the required number of times. The calendar plan of renovation for three wave objects with the allocation of the leading stream is presented. The ratio of flow processes during renovation is most clearly reflected in the constructed cyclogram of a multi-rhythmic object flow modified for renovation conditions. Combined schedules of renovation of in-line construction are constructed. Conclusions. Despite the considerable variety of renovated neighborhoods and projects for the construction of new houses, the authors of the article prove that traditional in-line construction with the allocation of characteristic stages is possible. For large contracting organizations, it is realistic to form a multi-rhythmic object flow with the allocation of the construction stage as the leading flow and calculate the renovation cyclogram.
Other Latest Articles
- Determination of modeled costs at sewage treatment plants in the case of different sequences of treatment
- Runoff irrigation practices and challenges in western lowlands of Eritrea
- Principles of strategic planning for the development of “green” infrastructure of the urban environment
- Study of the characteristics of the ascending vortex of the cyclone and the concentration of dust along its section
- Checking of the robustness of precast structural systems based on the energy balance method
Last modified: 2022-06-07 23:39:58