RESEARCH OF OPERATING MODES OF THE MAIN OIL PIPELINE FOR THE REMOVAL OF WATER ACCUMULATIONS
Journal: International Scientific Journal "Internauka" (Vol.1, No. 125)Publication Date: 2022-06-15
Authors : Hryhorskyi Stanislav; Ivanov Oleksandr;
Page : 39-42
Keywords : volley speed; ascending section; speed of gradual removal; geometric slope;
Abstract
The method of calculating the productivity of the main oil pipeline for the destruction and removal of accumulations of water from the cavity of the pipeline is considered. For the experimental section of the oil pipeline, the value of salvo
and washout velocity of oil movement was estimated, taking into account seasonal changes in oil properties, features of the route profile and actual operating modes.
Other Latest Articles
- FEATURES OF HYDRAULIC CALCULATION OF GAS DISTRIBUTION NETWORKS BY TRANSPORTATION OF A MIXTURE OF NATURAL GAS WITH HYDROGEN
- INFLUENCE OF ACOUSTIC PRESSURE WAVE ON FLAT GYRO SUSPENSION ELEMENTS
- FINANCIAL SECURITY OF THE CORPORATION
- RESEARCH OF METHODS AND TECHNOLOGIES OF BIOLOGICAL WASTEWATER TREATMENT
- ASSESSMENT OF THE MALARIAGENIC SITUATION IN THE KIROVOGRAD REGION IN MODERN CONDITION
Last modified: 2022-07-06 18:46:19