Delay Causes Analysis of Tugu Dam Construction in Trenggalek District

Journal: International Journal of Scientific Engineering and Science (Vol.6, No. 8)

Publication Date:

Authors : ; ; ;

Page : 1-3

Keywords : ;

Source : Download Find it from : Google Scholarexternal

Abstract

— The purpose of the construction of the Tugu Dam is to accommodate the potential of rainwater as the main water source used for irrigation water, clean water supply, flood control, Micro Hydro Power Plant and freshwater fisheries. In the implementation of the Tugu dam construction activities, completion delays were caused by several factors. On the existing problems, a research was conducted to analyze the factors causing delays, the most dominating factors and the strategy for solving them. Quantitative methods, data analysis research using factor analysis methods and multiple linear regression analysis with SPSS program for data processing. The results of the analysis of 11 variables that affect work delays obtained 2 dominant variables affecting work delays, namely the Situation Factor where the indicator is land acquisition with an index of 73.58% and the Change factor where the indicator is a design change with an index of 73.5%. The form of the settlement strategy is with the active role of the Government and the appropriate selection of experts from planning, implementation and supervision, so that it is hoped that the construction of dams can be carried out on time and with appropriate quality.

Last modified: 2022-11-02 20:29:27