Adaptive Project Monitoring and Control with Variable Reviewing Intervals
Journal: International Journal of Innovation in Engineering (IJIE) (Vol.1, No. 4)Publication Date: 2021-12-28
Authors : Seyed Taha Hossein Mortaji; Siamak Noori; Morteza Bagherpour;
Page : 34-46
Keywords : Statistical Project Control; Variable Reviewing Intervals; Adaptive Control Points; Earned Value Management; Project Monitoring and Control;
Abstract
This paper presents a managerial project control scheme in which the time between the control points is not fixed but instead is a function of the distance between the planned and the current performance levels. Varying the reviewing interval improves the efficiency of the project monitoring and control process and allows project managers to obtain the required information more quickly. To evaluate the effectiveness of the proposed scheme, a systematic computational experiment is carried out. Besides, a practical case study is given to illustrate the applicability of the proposed scheme. The results reveal the satisfactory performance of the adaptive control scheme.
Other Latest Articles
- Development of Technology Identification model focusing on Technology Intelligence and Components and Indicators extracted from Upstream Documents of the Islamic Republic of Iran
- Modeling and Solving Flow Shop Scheduling Problem Considering Worker Resource
- The Existence of Imported Fruit in Contemporary Rituals in Pandemic
- Examining Dimensions and Components and Application of Supply Chain Financing (In Chain Stores)
- Predatory Publication in Science and Ethical Principles: Features and Solutions
Last modified: 2022-12-15 00:45:15