Construction Management And Scheduling Of Residential Building Using Primavera
Journal: International Journal of Application or Innovation in Engineering & Management (IJAIEM) (Vol.4, No. 5)Publication Date: 2015-06-20
Authors : T.Subramani; K.Chinnadurai;
Page : 188-198
Keywords : Keywords: Construction Management; Scheduling; Residential Building; Using; Primavera;
Abstract
ABSTRACT Although the long-introduced Industrialized Building System (IBS) has promised to solve and improve the current construction method and scenario in our country, but the IBS method has not gained enough popularity. One of the reasons is due to lack of research works done to quantifying the benefit of IBS especially in construction time saving. In lieu with such scenario, this study conducted to quantify evidence of time saving in IBS application. Primavera P6 is amazing software, which is used not just by planners, but also managers, engineers, schedulers, and anyone else involved in planning, management, reporting of a project. Primavera P6 has benefited every industry from aerospace to manufacturing, electronics to IT, Telecom to Civil, any more. Primavera is an amazing project management software tool which is not just used by project managers. Designed to make managing large or complex projects a piece of cake, Primavera is the ideal tool for anyone who is involved in planning, monitoring and reporting on the progress of any big task, development or venture. The project management software tool of choice in industries such as construction, engineering, aerospace, transport and security, as well as in many other industry sectors. Primavera allows for top level planning as well as being ideal for managing the intricate details. This enables project managers, planners, planning controllers and other associated professionals to have instant access to all the project information they require at the touch of a button. Also from this study shown not all IBS components can improved to the overall construction duration, however by adopting IBS components can improve and expedite the construction of 18 stories residential building from the point of departure of the project throughout of the whole of project‘s with a total 405 days or 42% the time saving
Other Latest Articles
- Suburban Changes In Salem By Using Remote Sensing Data
- The Survey Of Carbon Footprint In Industrial Zone And Commercial Zone
- Experimental Study On Bagasse Ash In Concrete
- Experimental Investigation Of Using Ceramic Waste As A Coarse Aggregate Making A Light Weight Concrete
- Experimental Study On Plastic Waste As A Coarse Aggregate For Structural Concrete
Last modified: 2015-06-14 19:44:00