ResearchBib Share Your Research, Maximize Your Social Impacts
Sign for Notice Everyday Sign up >> Login

OPTIMIZATION OF REAL TIME DISRUPTION MANAGEMENT FOR A TWO-STAGE BATCH PRODUCTION ? FUZZY INVENTORY SYSTEMS WITH RELIABILITY CONSIDERATIONS VIA GEOMETRIC PROGRAMMING

Journal: International Journal of Applied Mathematics & Statistical Sciences (IJAMSS) (Vol.4, No. 4)

Publication Date:

Authors : ; ;

Page : 15-24

Keywords : Inventory; Fuzzy Geometric Programming; EOQ;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

The purpose of this paper is to discuss the fuzzy EOQ model for a two-stage production ? inventory system with reliability considerations. In this paper we establish and analyse two Economic order quantities (EOQ) that in this model, some parameters are fuzzy variables. This note is based on inventory models under total cost minimization and profit maximization that have solved via fuzzy geometric programming. (FGP) techniques by A. Kordi (2010). Through FGP and by Zadeh’s extension Principle, two main Programs are transformed to a pair of two-level of mathematical programs. The upper bound and lower bound of the objective value are obtained by solving the pair of geometric programs.

Last modified: 2015-08-01 22:20:07