ResearchBib Share Your Research, Maximize Your Social Impacts
Sign for Notice Everyday Sign up >> Login

Finding Number of Furnaces Through Break-Even Analysis in Small-Scale Manufacturing Unit

Journal: BEST : International Journal of Management, Information Technology and Engineering ( BEST : IJMITE ) (Vol.3, No. 8)

Publication Date:

Authors : ; ;

Page : 9-18

Keywords : Break-Even Point; Break-Even Quantity; Manufacturing Operation Time;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

In this paper the break-even analysis tool applied for product insulating sleeve in small-scale manufacturing units. In manufacturing operations time in furnace section taken highly time as compared to another sections. The break-even quantity (BEQ) and break- even point (BEP) are obtained when increasing the number of furnace. The calculations are shown in break-even chart. When applying three furnaces that are sufficient to reduced the operations time in furnace sections.

Last modified: 2015-08-24 19:46:09