Finding Number of Furnaces Through Break-Even Analysis in Small-Scale Manufacturing Unit
Journal: BEST : International Journal of Management, Information Technology and Engineering ( BEST : IJMITE ) (Vol.3, No. 8)Publication Date: 2015-08-31
Authors : Basant Kashyap; Sridhark;
Page : 9-18
Keywords : Break-Even Point; Break-Even Quantity; Manufacturing Operation Time;
Abstract
In this paper the break-even analysis tool applied for product insulating sleeve in small-scale manufacturing units. In manufacturing operations time in furnace section taken highly time as compared to another sections. The break-even quantity (BEQ) and break- even point (BEP) are obtained when increasing the number of furnace. The calculations are shown in break-even chart. When applying three furnaces that are sufficient to reduced the operations time in furnace sections.
Other Latest Articles
- AN ANALYSIS OF SECURITY ISSUES IN E-BANKING
- RASIO PANJANG-LEBAR KARAPAS, POLA PERTUMBUHAN, FAKTOR KONDISI, DAN FAKTOR KONDISI RELATIF KEPITING PASIR (HIPPA ADACTYLA) DI PANTAI BERPASIR CILACAP DAN KEBUMEN
- TINJAUAN PENAMBAHAN MINERAL ZN DALAM PAKAN TERHADAP KUALITAS SPERMATOZOA PADA SAPI FRISIAN HOLSTEIN JANTAN
- PENENTUAN DAYA DUKUNG PERAIRAN UNTUK PERIKANAN ALAMI (STUDI KASUS: SITU CILALA, KABUPATEN BOGOR)
- PERAN INKUBATOR BISNIS PERGURUAN TINGGI DALAM PENINGKATAN KINERJA USAHA UKM PANGAN
Last modified: 2015-08-24 19:46:09