PERT AND LOB SIMPLIFIED INTEGRATED MODEL FOR DETERMINING PROBABILISTIC SCHEDULING OF REPETITIVE PROJECTS
Journal: International Journal of Engineering Sciences & Research Technology (IJESRT) (Vol.4, No. 9)Publication Date: 2015-09-30
Authors : Sherif M. Hafez; Remon F. Aziz; Heba M. Elsisi;
Page : 109-118
Keywords : : Repetitive Construction Projects; Construction management; Program Evaluation and Review Technique; Line of Balance; Excel Programming; Software.;
Abstract
In a construction project environment there is always a risk or chance that adverse conditions could occur, which may cause the project to fail, or couldn’t meet its planned objectives. The importance of planning and time scheduling has emerged in the last decade and it becomes an essential step for any construction project to reduce this risk. The project schedule should reflect all of the work associated with delivering the project on time. Without a full and complete schedule, the project manager will be unable to communicate the complete effort, in terms of cost and resources, necessary to deliver the project. Most current methods of time schedules and estimating have been converted to software programs in order to be easy to be used by planners and to avoid manual mistakes. Presently, experts in the fields of time planning are searching for better software they can depend on, that is more powerful, easier and serves different kinds of projects. This paper develops software that is essential for improving time planning and estimating for projects that repeat linearly and focuses on features of PERT and LOB for calculating expected completion probability of any repetitive construction project within a specified end date. The software is designed by EXCEL spreadsheet system to provide the factors that affect projects end date probability. At the end, illustrative cases of study are presented to validate and verify the proposed software.
Other Latest Articles
- ELECTRIC CHARGES ON PHOSPHOR PARTICLES DETERMINE FEATURES OF LIGHTED FL TUBES
- INTEGRATED BIM AND DES FRAMEWORK FOR EFFECTIVE TIME AND COST MANAGEMENT OF SLIPFORM OPERATIONS
- ROLE OF CHROMATIC NUMBERS IN GRAPH THEORY
- DEVELOPMENT AND FAILURE MODE ANALYSIS OF CENTERING AND PLUNGE MACHINE (500)
- PERFORMANCE IMPROVEMENT OF QAM BASED WIRELESS COMMUNICATION SYSTEM USING OSTBC
Last modified: 2015-09-07 12:09:27