Analisis Incremental Kelayakan Penambahan Lini Perakitan Engine Motor PT ABC
Journal: Comtech (Vol.4, No. 1)Publication Date: 2013-06-29
Authors : Jonny;
Page : 537-542
Keywords : motorcycle unit manufacture; Manufacturing motorcycle unit; incremental analysis; engine;
Abstract
Manufacturing motorcycle unit in Plant 1 of PT ABC requires engine supply from Plant 2. This has some burden on the operating cost of Plant 1 and the opportunity loss as well due to delay of motor engine delivery. Based on the problem, team proposes additional engine line in Plant 1 to cut engine supply from Plant 2. Therefore, team analyzes this proposal using incremental analysis to determine whether the proposal is feasible or not by comparing before and after condition with result NPV about IDR 967 Billion and Payback Period under 1 year. By this result, team determines that this proposal is recommended to be approved by management.
Other Latest Articles
- Pengaruh Lama Tinggal terhadap Tingkat Partisipasi Masyarakat dalam Pengelolaan Lingkungan Permukiman
- Perancangan Model Hirarki Keputusan dan Sistem Basis Data pada Sistem Informasi Sumber Daya Manusia Sub-Sistem Rekrutmen dengan Metode Berjenjang
- Model Perancangan Sistem Pemesanan Tiket Bus Antar Kota Antar Propinsi Khusus di Cabang
- Pengukuran Kinerja Efektif Departemen Pengembangan Sistem Informasi dengan Metode Balanced Scorecard pada PT XYZ
- Evaluasi Knowledge Management System di Kompas Gramedia Menggunakan Analisis Faktor
Last modified: 2015-11-17 15:47:12