Model Terintegrasi Penjadwalan Batch dan PM dengan Kriteria Minimalisasi Biaya Simpan, Setup dan PM pada Mesin Dengan Increasing Failure Rate
Journal: Comtech (Vol.4, No. 1)Publication Date: 2013-06-29
Authors : Zahedi;
Page : 121-133
Keywords : batch scheduling; preventive maintenance scheduling; saving cost; setup cost; increasing failure rate;
Abstract
Development of today"s manufacturing systems leads to the getting shorter in product life cycle, more variety of products, as well as increasing in consumer demand for quality and timeliness. Thus the accuracy and speed of decision-making within the manufacturing system becomes important. This paper proposes an integrated model of batch scheduling and preventive maintenance scheduling, in assumption no non-conforming parts to the criteria of minimizing the total saving cost, setup cost, preventive maintenance cost in minimizing the actual flow time on a machine with increasing failure rate. An example is provided to show how the model and algorithm wor
Other Latest Articles
- Penggunaan Fisikal Model dalam Perancangan Arsitektur
- Aplikasi AHP dalam Menentukan Kandidat Gubernur DKI Jakarta 2012-2017
- Perancangan Sistem Informasi Signature Verification System for Banking
- Analisis dan Perancangan Aplikasi Basis Data Penilaian Kinerja Karyawan Menggunakan Metode 360-Degree Feedback berbasis Web pada PT IFS Solutions Indonesia
- Tipologi Bangunan di Jalan Pakubowono Kebayoran Baru, Jakarta Selatan
Last modified: 2015-11-17 15:47:12