MEASUREMENT ERROR EFFECT ON THE POWER OF THE CONTROL CHART FOR ZERO-TRUNCATED BINOMIAL DISTRIBUTION UNDER STANDARDIZATION PROCEDURE
Journal: International Journal for Quality Research (Vol.8, No. 4)Publication Date: 2014-12-30
Authors : Anwer Khurshid; Ashit B. Chakraborty;
Page : 495-504
Keywords : power; zero-truncated binomial distribution (ZTBD); measurement error; average run length (ARL);
- OPTIMIZATION OF CASTING PROCESS BASED ON BOX BEHNKEN DESIGN AND RESPONSE SURFACE METHODOLOGY
- Treatment Efficiency of UV/H2O2 Process on Simulated Textile Industry Wastewater by using Box-Behnken Design (BBD) Coupled with Response Surface Methodology (RSM)
- Genetic Algorithm and Response Surface Methodology Based Optimization of Electrical Discharge Machining (EDM) Process
- Finite Element Investigation and Optimization of Tool Wear in Drilling Process of Difficult-to-Cut Nickel-Based Superalloy using Response Surface Methodology
- Optimization of CNC Face Milling Process Parameters using Response Surface Methodology and Particle Swarm Optimization Algorithm
Abstract
Measurement error effect on the power of control charts for zero truncated Poisson distribution and ratio of two Poisson distributions are recently studied by Chakraborty and Khurshid (2013a) and Chakraborty and Khurshid (2013b) respectively. In this paper, in addition to the expression for the power of control chart for ZTBD based on standardized normal variate is obtained, numerical calculations are presented to see the effect of errors on the power curve. To study the sensitivity of the monitoring procedure, average run length (ARL) is also considered.
Other Latest Articles
- IMPACT OF EDUCATION, GENDER AND AGE ON CONSUMER LOYALTY
- INFORMATION TECHNOLOGY AS A DETERMINANT OF SMES COLLABORATION AND INNOVATIVENESS
- FROM QUALITY GURUS AND TQM TO ISO 9001:2015: A REVIEW OF SEVERAL QUALITY PATHS
- SMART OBJECTS EMBEDDED PRODUCTION AND QUALITY MANAGEMENT FUNCTIONS
- OPTIMIZING MAINTENANCE PROCESSES ON CUSTOMER SITE IN A DECENTRALIZED ORGANIZATION BASED ON MULTI-SITE TEAMS
Last modified: 2015-11-21 20:50:27