A NEW APPROACH TO JOB SHOP-SCHEDULING PROBLEM
Journal: International Journal for Quality Research (Vol.1, No. 1)Publication Date: 2007-03-31
Authors : Ramezanali Mahdavinejad;
Page : 79-86
Keywords : Job shops scheduling; Priority dispatching rules; Makespan; Hybrid heuristic algorithm;
Abstract
In this paper, single-processors job shop scheduling problems are solved by a heuristic algorithm based on the hybrid of priority dispatching rules according to an ant colony optimization algorithm. The objective function is to minimize the makespan i.e. total completion time , in which a simultanous presence of various kinds of ferons is allowed. The process of finding the best solution will be improved by using the suitable hybrid of priority dispatching rules. Ant colony optimization algorithm, not only promote the ability of this proposed algorithm, but also decreases the total working time because of decreasing in setup times and modifying the working production line. By solving some problems as samples (i.e. Fisher's & Thomson's problems), this algorithm is compared with the others. The results show that when the size of the problem becomes larger the deviation from lower limit increases, but its rate decreases with the size of the problems, so that it reaches to its limit.
Other Latest Articles
- THE IMPORTANCE OF QUALITY MANAGEMENT SYSTEM OF THE HIGH EDUCATION AND CORRELATION WITH ISO 9000 STANDARDS
- QUALITY IN ENVIRONMENTAL EDUCATION AT THE FACULTY OF MECHANICAL ENGINEERING TECHNICAL UNIVERSITY OF KOSICE
- LI-ANODE NANOCOMPOSITE USING POROUS SILICON NANOPARTICLES
- APPROACH TO QUALITY ASSURANCE IN HIGHER EDUCATION
- CASE STUDIES CONCERNING THE BAD INFLUENCE OF THE LIMIT MEASUREMENT ERROR ON CONTROL OBJECTIVITY
Last modified: 2015-11-22 00:22:49