Research on the Modeling of Xiaosha River Artificial Wetland and the Scheduling Program of Water Quality and Quantity
Journal: Journal of Water Resource and Hydraulic Engineering (Vol.2, No. 2)Publication Date: 2013-06-24
Authors : Qun Miao Xipeng Wang Lei Bian Guanghua Shao;
Page : 61-64
Keywords : BP Neural Network; Virtual Data; Construction of Model; Scheduling of Water Quantity and Quality;
Abstract
During the research of Xinxue River artificial wetland of Nansi Lake, through consulting literature and inferred analysis, BP neural network forecasting model of Xiaosha River artificial wetland is selected to carry on follow-up study. Because Xiaosha River artificial wetland is in the planning and design stage, and the establish of BP neural network forecasting model requires large amounts of data, therefore this paper built virtual data of influent quantity and quality and effluent quality, and studied on the modeling of Xiaosha River artificial wetland and the scheduling program of water quality and quantity.
Other Latest Articles
- Dumping Effects of Submerged Vertical Baffles and Slat Screen on Forced Sloshing Motion
- Comparison of the Effects of k-ε, k-ω, and Zero Equation Models on Characterization of Turbulent Permeability of Porous Media
- High-Efficient Deterministic Secure Quantum Communication Based on Four-Qubit Cluster Sate
- Review Paper on Two Factor Authentication Using Mobile Phone (Android)
- Personalised Search Engine with Dynamic Updating
Last modified: 2013-08-15 17:58:32