Surveying, Planning and Scheduling For A Hill Road Work at Kalrayan Hills by Adopting ISS Method

Journal: International Journal for Scientific Research and Development | IJSRD (Vol.3, No. 10)

Publication Date:

Authors : ; ; ; ; ;

Page : 952-955

Keywords : Primavera Project Planner; intelligent scheduling system; Microsoft Project;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

To date, few construction methods have helped the project managers make a decision on the near-optimum distributions of men, material, Space and tools according to their job objectives and job limitations. This thesis presents an intelligent scheduling system (ISS) that can assist the project managers to find the near-optimum agenda plan according to their job objectives and job limitations. Intelligent scheduling system (ISS) uses model techniques to share out resources and allocate dissimilar levels of priorities to different tricks in each model cycle to find the near-optimum solution. ISS considers and combines most of the important construction factors (agenda of task, expenses, manpower, breathing space, utensils and material) at the same time in a incorporated environment, which makes the resulting agenda that will be nearer to optimum. Moreover, ISS allows for what-if analysis of probable scenarios, and schedule adjustments based on unexpected conditions (modified orders, delayed material delivery, etc.). As a final point, two model applications and one real-world construction job are utilized to illustrate and evaluate the success of ISS with two commonly used software packages, Primavera Project Planner and Microsoft Project.