MINIMIZATION OF MAKE SPAN THROUGH A NEW CONCEPT OF SCHEDULING SYSTEM BASED ON RCPSP HEURISTICS
Journal: International Journal of Engineering Sciences & Research Technology (IJESRT) (Vol.5, No. 2)Publication Date: 2016-02-29
Authors : Dr.C. Prabhu Ramakrishnan;
Page : 412-420
Keywords : LESTA; MINSLK; and H1;
Abstract
In this paper we consider the problem of scheduling the tasks to workers in a make to order manufacturing company where the products are massive vibrating screens. We consider the above problem because the workers had given more importance as they are the main resources to form the structures following a detailed design drawing. As there is limited work force we considered the RCPSP heuristics taking into account the main constraint as work force. In a make - to - order manufacturing company all the production activities commences when the customer order arrives, hence a detailed step by step procedure from execut ion of order to shipment was explained in the proposed scheduling system. Then scheduling the operations would be done through LESTA,MINSLK,and H1 heuristic using these heuristics an attempt was made to minimize the make span
Other Latest Articles
- EFFICIENT MAP STORING AND REDUCE READING FOR RELATED BIG DATA BATCH TASKS
- THEORY APPROACH ON ROUGH SET
- AN INNOVATIVE HIGHLY SECURED IP BASED SYSTEM FOR INDUTRIAL APPLICATIONS USING GRAPHICAL PROGRAMING LANGUAGE (LabVIEW)
- FREQUENCY DEPENDENT ELECTRICAL PROPERTIES OF TIO2/COO CORE - SHELL THIN FILMS
- A TECHNIQUE TO STUDY SOFTWARE REUSABILITY USING OBJECT ORIENTED MATRICES
Last modified: 2016-02-16 23:10:35