A Hybrid Cuckoo Algorithm for Lot Scheduling Problem Using Extended Basic Period and Power of Two Policy
Journal: Mehran University Research Journal of Engineering and Technology (Vol.35, No. 2)Publication Date: 2016-04-01
Authors : SYED HASAN ADIL; KAMRAN RAZA; MANZOOR AHMED HASHMANI;
Page : 229-238
Keywords : Economic Lot Scheduling Problem; Basic Period Approach; Extended Basic Period Approach; Hybrid Cuckoo Search Algorithm;
Abstract
This paper addresses ELSP (Economic Lot Scheduling Problem) using EBPA (Extended Basic Period Approach) model with PoT (Power of Two) policy. The objective is to solve the ELSP using HCA (Hybrid Cuckoo Search Algorithm). The proposed approach improves the solution (i.e. minimizes the total cost which is the sum of setup and inventory holding costs) obtained through GA (Genetic Algorithm).The solution obtained from HCA is compared with GA on 17 Bomberger?s problems. The comparison indicates the superiority of the proposed HCA over GA with respect to the solution quality.
Other Latest Articles
- Design, Development and Performance Evaluation of a SmallScale Solar Assisted Paddy Dryer for on Farm Processing
- Lexicon Reduction for Urdu/Arabic Script Based Character Recognition: A Multilingual OCR
- Architecture of WiFi Based Broadcast Network for Rural Community
- Thermal Performance of Typical Residential Building in Karachi with Different Materials for Construction
- Socio-Cultural Value of Public Open Spaces with Hamchas in Dera Ghazi Khan City, Pakistan
Last modified: 2016-03-12 23:59:21