SCS &GIS ENABLED PROJECT MANAGEMENT SYSTEM FOR DEVELOPMENT AND IMPLEMENTATION PHASE OF GAS DISTRIBUTION PROJECT
Journal: International Journal of Mechanical Engineering and Technology(IJMET) (Vol.6, No. 8)Publication Date: 2015-08-26
Authors : G. DHAMODARAN; R. J. GOLDEN RANJITH;
Page : 156-169
Keywords : Human Video Interface Monitor; GIS -Geographical Information System; Central Project Room; Pipelines modules; Pipeline alignment sheets; GPS Technology and SCS- Supervisory Control System; IJMET; IAEME;
Abstract
Background/Objectives: To investigate the usefulness of requirement of ‘Supervisory Control System for Gas Distribution Construction Project Management’. Methods/Statistical analysis: Human Video interface model preparation and updating the live progress of the project to Update on the monitor installed in Central Project Room thru Arc GIS and other Pipeline modules interlinking with GPS Technology. Results/Findings: Can be implemented at construction projects of Gas Distribution Project where there will be complex Network of pipelines and were geographically dispersed. Conclusion/Application: “Supervisory Control System with GIS data for development and implementation phase for Gas Distribution Construction Project Management” can be implemented.
Other Latest Articles
- PERFORMANCE ANALYSIS OF A INVERTED DOWNDRAFT BIOMASS WOOD STOVE
- MORPHOLOGICAL CHARACTERISATION OF POLY METHYL METHACRYLATE FOR SURFACE COATING OF METALS
- EXPERIMENTAL INVESTIGATION OF CREEP BEHAVIOUR OF ALUMINIUM ALLOY (LM25) AND ZIRCONIUM DI-OXIDE (ZRO2) PARTICULATE MMC
- PERFORMANCE EVALUATION OF BIODIESEL WITH A COMBUSTION ENHANCER ADDITIVE
- NUMERICAL ANALYSIS OF THE EFFECT OF THE NUMBERS OF BLADES ON THE CENTRIFUGAL PUMP PERFORMANCE AT CONSTANT PARAMETERS
Last modified: 2016-05-25 21:49:40