AN ANALYSIS ON EFFICIENT PROJECT-MANAGEMENT BY USING PRIMAVERA
Journal: International Journal of Engineering Sciences & Research Technology (IJESRT) (Vol.5, No. 5)Publication Date: 2016-05-30
Authors : Prof Gunjal P.K; Rajiv Kumar Goswami; Punit M Bedmutha;
Page : 864-868
Keywords : Planning of project; Scheduling and Monitoring of activities and Resource leveling.;
Abstract
Project Controlling uses the data of collection, recording and reporting information to bring Actual performance to planned performance. As larger the as more the complexity is in exchange information on timely basis gets reduce. As a result we see project don’t achieve its mission within allotted time and cost. Increasing the productivity in terms of material and human resource is called project management. To achieve desire result we are using Primavera a product of oracle. Primavera planner is a powerful tool present for controlling, scheduling and monitoring of project very efficiently
Other Latest Articles
- DISCRETE POPULATION GROWTH MODEL WITH CONSTANT FORCED REPRODUCTION AND CONSTANT HARVESTING
- A SURVEY PAPER ON HIGH UTILITY ITEMSETS MINING
- EFFECT OF OCCUPATIONAL STRESS IN INDUSTRIES
- RESEARCH ON OPTIMIZATION MODEL OF THE LINKAGE TOU TARIFF UNDER THE MODE OF CHINA ELECTRIC POWER SYSTEM
- STATUS OF REFRIGERATION AND AIR CONDITIONING SHOPS IN THE PROVINCE OF BILIRAN
Last modified: 2016-05-29 13:34:12