DRAUGHT FORCE REQUIREMENTS OF A DISC PLOUGH AT VARIOUS TRACTOR FORWARD SPEEDS IN LOAMY SAND SOIL, DURING PLOUGHING
Journal: International Journal of Advanced Research in Engineering and Technology (IJARET) (Vol.6, No. 7)Publication Date: 2015-07-30
Authors : S.O. NKAKINI;
Page : 52-68
Keywords : Draught; Tillage; Disc plough; Tractor forward speeds; Ploughing operation; Iaeme Publication; IAEME; Technology; Engineering; IJARET;
Abstract
Tillage operation in loamy sand soil for disc ploughing on an experimental plot of twenty different soil moisture levels at tractor forward speeds of 1.94 m/s, 2.2 m/s and 2.5 m/s were conducted using trace tractor techniques. The variables: draw-bar pull force, moisture content, cone index, tractor forward speeds, widths of cut and depths of cut were measured. In determining the effect of moisture content and forward speeds on draught forces, results revealed that at lowest moisture content of 1.53% draught forces of 4688.33 N, 5708.33 N and 6758.33 N at tractor forward speeds of 1.94 m/s, 2.2 m/s and 2.5 m/s, were obtained. The draught forces of 3008.32 N, 4018.66 N and 5068.os33 N were obtained at highest moisture content of 24.14% with tractor forward speeds of 1.94 m/s, 2.2 m/s and 2.5 m/s. The tractor forward speeds of 2.5 m/s recorded the highest draught force of 6758.33 N. The lowest draught forces at respective moisture levels were obtained at tractor forward speed of 1.94 m/s. It is clear that, draught forces increase with increase in tractor forward speeds. This result indicates that the best tractor forward speed for ploughing operation is 2.5 m/s which took place within the range of the optimum soil moisture of 2.5?25% for soil under consideration
Other Latest Articles
- ERGONOMIC EVALUATION OF LAWN MOWER OPERATION FOR COMFORT IN RIVERS STATE, NIGERIA
- SPATIAL POSITIONING OF FRACTURE IN HARD ROCK
- AN EXPERT SYSTEM FOR MAKE OR BUY DECISION IN MANUFACTURING INDUSTRY
- ANALYSIS OF MICROSTRUCTURE OF FUMED SILICA REINFORCED POLYESTER COMPOSITES
- EXPERIMENTAL STUDY ON A STEPPED BASIN SOLAR STILL
Last modified: 2016-05-30 16:24:23