METHOD OF LIFTING SLAB AT BUILDING OF MULTISTORY CONSTRUCTION STRUCTURES WITH CONCRETE-FILLED STEEL TUBE COLUMNS
Journal: Academic Journal "Industrial Machine Building, Civil Engineering" (Vol.2, No. 42)Publication Date: 2014-11-26
Authors : S.V. Shkirenko;
Page : 157-160
Keywords : method at building of multistory construction structures; concrete-filled steel tubes;
Abstract
The method at building of multistory construction structures with concrete-filled steel tube columns is offered by means of jacks.
Other Latest Articles
- THE STRESS-STRAIN STATE OF THE RETAINING WALLS ARE A SPECIAL TYPE FOR COMPLEX DEFORMITIES
 - ROUND FOUNDATION CALCULATION IN CASE OF COMPLEX LOADING
 - CONCRETE FILLED STEEL TUBE BEARING CONSTRUCTIONS IN ONE-STOREY INDUSTRIAL BUILDINGS
 - ANALISYS OF STRESS-STRAIN STATE OF REINFORCED CONCRETE SLABS WITH STEEL FRAMING BY SOFTWARE PACKAGE ?LIRA?
 - RESULTS OF EXPERIMENTAL STUDIES CONCRETE BEAMS WITH REINFORCEMENT CARRIED OFF
 
Last modified: 2016-08-02 15:36:27
                    Share Your Research, Maximize Your Social Impacts
                

