Lean, Green and DMADV Tool Based Approach for an Effective Execution of Residential Building Project
Journal: International Journal of Engineering Research (IJER) (Vol.5, No. 5)Publication Date: 2016-05-01
Authors : Gourav Tiwari; S. Kesavan;
Page : 383-385
Keywords : Lean; Design; water Supply; DFSS;
Abstract
In this paper introduce how to use the principal of LEAN and SIX SIGMA in Residential Water Supply Project and how to supply treated water at minimum price rate. Now a days State of Rajasthan and Gujrat affected by water scarcity Problem. By the help of six sigma principal, water scarcity problem can be reduce and cover the full population.
Other Latest Articles
- Dynamic Performance of Stand-Alone Wind-Driven Single Machine-Brushless Double Fed Generator
- Design and Durability Testing of Composite Mono Leaf Spring
- Determination of Thin-Layer Drying Characteristics of a Plantain Sample at Different Temperatures
- Mathematical Model Of Thin-Layer Drying Process In A Plantain Sample
- A study: Perceived Availability of Opportunities for Enhancing “Personal Enrichment Skills” and Its Utilization
Last modified: 2016-08-08 18:14:05