MODEL FOR WATER RESOURCES MANAGEMENT IN LOWER COURSE OF AMU-DARYA WITH REGARD TO DRYNESS OF YEAR
Journal: Science and world (Vol.1, No. 34)Publication Date: 2016-06-16
Authors : Akhmedkhodzhayeva I.; Khodzhiev A.; Samiev L.;
Page : 23-25
Keywords : water resources; reservoir; efficient operation mode; trend calculation; waterworks facility;
Abstract
In this paper the procedure for non-stationary level operation of THC (Tuyamuyun Hydro Complex) is suggested, the forecast of reservoir silting is presented and a brief assessment of the state of Ruslovoy reservoir of THC for the period of 2007?2012 is performed.
Other Latest Articles
- PROBABILISTIC MODEL OF WORD LENGTH DISTRIBUTION IN THE ENGLISH LANGUAGE
- DIALOGUE AS A MEANS OF DEVELOPING COGNITION SKILLS IN TEACHING STEREOMETRIC PROBLEM SOLVING
- AN APPROACH TO SOLVING OPTIMAL CONTROL PROBLEMS WITH CONSTRAINTS
- A STUDY ON EMPLOYEE ENGAGEMENT THROUGH JOB SATISFACTION OF EMPLOYEE IN SELECTED COMPANY
- A STUDY ON STRESS MANAGEMENT IN SELECTED COMPANY
Last modified: 2016-08-19 22:36:31