Abstract
Abstract. In the manuscript given a modern real estate market, the means of construction works, particularly the use of tower cranes, ensure safe conditions of installation and use. The requirements of regulations to ensure the stability and durability of cranes as in general whole and metal structures and mechanisms, formulated purpose of the article contained an expanded main part where given specific materials of primary survey site of the accident, testimony, analysis of the project of works, recordings of the sections of the passport crane engineering calculations of the stability of the crane with the necessary illustrations and results of calculations. The evaluation of the violations of the provisions of the owner of the crane regulations of occupational safety, project designers, installation work, fitters, crane when performing installation and set out measures to prevent such accidents and accidents.
Other Latest Articles
- Modelling of single-bucket loader working processes by ?autodesk inventor?
- Equipment for repair and reconstruction work on the basis of lift trucks
- Research of equipment for development of sticky soils
- Equipment for preparatory works at implementation of trenches
- Features drive special equipment production machines
Last modified: 2016-11-08 04:19:55