ResearchBib Share Your Research, Maximize Your Social Impacts
Sign for Notice Everyday Sign up >> Login

Reduce the research project "mirror" ponds at the tailings "suhachоvskoe" 1 and 2 sections on radiation safety

Journal: Construction, materials science, mechanical engineering (Vol.1, No. 84)

Publication Date:

Authors : ; ; ; ; ;

Page : 34-40

Keywords : Tailings dam; radiation background; ecological situation; industrial platform; sanitary protection zone.;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

Introduction. At the time of the design of the tailings "Suhachovskoe" 1 section 1962 ? 1963., The production of civil engineering works in the period from 1963 to 1967, as well as the operation of the tailings in the period 1968 ? 1983. When it reached project completion and was suspended the actual filling line with project that comply with sanitary regulations. [1] Tailings "Suhachovskoe" Section 2 was designed in 1979 ? 1980., And began operation in 1983 until the collapse of PO "PCP" in the 2000s. Purpose. To determine the factors influencing the unstable radiation and ecological situation in the "Sukhachovskoe" industrial site. Conclusion. Therefore, factor in unstable radiation and ecological situation in the "Sukhachovskoye" industrial site is the lack of water supply water recycling, and as a result of a decrease in the area of settling pond, 1 and 2 sections, the increase in open area of disposal of surface RAV and optional dusting how of the territory "Sukhachovskoe" industrial site, its sanitary protection zone, the personnel Enterprise "Barrier" SE "38 OITCH" scientists and adjacent areas and farmland.