ResearchBib Share Your Research, Maximize Your Social Impacts
Sign for Notice Everyday Sign up >> Login

COMPREHENSIVE VERIFICATION CONSTRUCTION COMPLIANCE CONTROL AS THE DEVELOPER’S PROJECT RISK REDUCTION TOOL

Journal: International Journal of Civil Engineering and Technology (IJCIET) (Vol.9, No. 1)

Publication Date:

Authors : ; ;

Page : 985-993

Keywords : Construction technology; construction compliance monitoring; building authorities; risk; verification control; laboratory quality control; quality of finished construction products;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

The article shows the value of the building control device of the Developer (Technical customer) as an effective tool to reduce the level of potential risks in the implementation of investment construction projects. A study of the experience of building control in the Russian Federation and other countries, such as the United Kingdom, the United States, Germany, etc., is presented. The main features of the interaction between the Customer and the General Contractor in the field of quality management of construction products in Western countries are revealed. The probabilities of mistakes made by construction participants affecting the safety of construction and product quality and the participants in the investment and construction process, which account for the greatest likelihood of various errors, are considered. The role of the quality management system for construction products in the conditions of growth of technological and technical complexity of objects, volumes of works performed, including specialized ones, use of technical personnel, construction materials and equipment from different countries is determined. In general, the practice of involving organizations for building control, the need for an integrated, systematic approach to the acceptance process are described. Practical significance lies in the proposed verification verification scheme, including laboratory confirmation of the Contractor's data with the aim of optimizing and improving the control function, which is analyzed using existing statistical methods. At the same time, the ways of determining the qualitative and quantitative characteristics of the sample (verification control) from the general array of the general population (the initial control of the Contractor) were marked with observance of the condition of representativeness. Control plans, grades of quality level and types of control in terms of responsibility are defined.

Last modified: 2018-06-04 21:13:48