IMPROVEMENT OF A LONGWALL RECOVERY ROOM ERECTION TECHNOLOGY
Journal: International Journal of Civil Engineering and Technology (IJCIET) (Vol.10, No. 2)Publication Date: 2019-03-18
Authors : Oleg Ivanovich Kazanin Victor Victorovich Klimov Vyacheslav Yuryevich Alekseev Andrey Alexandrovich Sidorenko;
Page : 1148-1153
Keywords : underground mining; coal seams; longwall; recovery room; stability; synthetic mining grid; numerical simulation; periodic roof weighting;
Abstract
The numerical analysis of the stress-strain state of the rock massif at different location the longwall erection of recovery rooms are executed. Need of accounting of value of periodic roof weighting is shown. As the pacing factors having the impact on the value of periodic roof weighting durability and power of the main roof and speed of advance of the longwall face are specified. The possibility of use of MARCO electro-hydraulic control equipment systems for exact determination of periodic roof weighting is shown. The recovery rooms erection technology providing decrease span of time and costs of moving of the longwall equipment is offered.
Other Latest Articles
- Productivity as an Indicator of Proper use of Human Resource Management of Presbyterian Secondary Schools in Cameroon
- COMPUTATIONAL FLUID DYNAMICS STUDY OF VENTILATION FLOW PATHS ON LONGWALL PANEL
- The Study on Relationship between Gold and Oil - A General Perspective
- Development of Srinagar under Ashoka
- ANALYSIS OF MULTIPLE SEAM STABILITY
Last modified: 2019-05-21 18:15:10