MINING OF SEVERAL LONGWALL PANELS WITHOUT RE-INSTALLATION OF EQUIPMENT OF COAL FACE: A CASE STUDY
Journal: International Journal of Civil Engineering and Technology (IJCIET) (Vol.10, No. 3)Publication Date: 2019-03-30
Authors : Nikolay Sergeevich Golikov Andrey Yurievich Kuzkin Pavel Vitalievich Shishkin;
Page : 3227-3232
Keywords : underground mining; coal mine; longwall; face equipment; downtime; reinstallation; removal; efficient; output;
Abstract
The main objective of researches was the analysis of experience of application of technological schemes of mining of longwall panels without re-installation of the equipment of a coal face. For conditions of the mine Taldinskaya-Zapadnaya-2 change of coal face output when mining longwall panels with a longwall turn is shown. Sharp decline in output of a longwall at a face turn is shown. Comparison of efficiency of mining of longwall panels with a turn of a complex and at re-installation of a longwall is executed. Recommendations about decrease in equipment downtimes and increase in efficiency of re-installation of the equipment of a longwall are made.
Other Latest Articles
- Cardiopulmonary Resuscitation
- A CASE STUDY OF LONGWALL GATEROAD FLOOR HEAVE
- A Study of Customer Purchasing Behaviour of Automobiles in Kukatpally, Hyderabad
- ANALYSIS OF EFFICIENCY OF RECOVERING AND RE-INSTALLATION OF LONGWALL EQUIPMENT IN THE CONDITIONS OF THE KUZNETSK COAL BASIN
- Renal Transplantation in Children
Last modified: 2019-05-23 15:58:21