Contractors’ Perspectives towards Factors Affecting Cost Estimation in Palestine
Journal: Jordan Journal of Civil Engineering (JJCE) (Vol.1, No. 2)Publication Date: 2007-04-01
Authors : Adnan Enshassi; Sherif Mohamed; Ibrahim Madi;
Page : 186-193
Keywords : Cost Estimation; Contractors; Building; Behavior.;
Abstract
Construction projects have certain characteristics that determine the appropriate actions to estimate their costs accurately. A key factor for a successful project is the preparation of an accurate estimate, which can influence factors ranging from project feasibility to profitability. The success or failure of a project is dependent on the accuracy of several estimates throughout the course of the project. Construction estimating is the compilation and analysis of many items that influence and contribute to the cost of a project. The purpose of this paper is to identify the essential factors related to cost estimation and to show the degree of importance of these factors in cost estimation of construction projects in the Gaza strip from contractors’ perspective. The results of analyzing fifty one factors considered in a questionnaire survey concluded that the main factors are: location of the project, segmentation of the Gaza strip and limitation of movements between areas, political situation and closure of the Gaza strip, financial status of the owner and increase in unit costs of construction materials. It is recommended to review cost estimation practice in terms of education and training required for those responsible for the estimating process. Contracting companies of various classifications are advised to provide training programs for their estimators to gain experience in cost estimation.
Other Latest Articles
- A Knowledge-based System for Pedestrian’s Roadway Crossing Behavior through Video Cameras
- Utilizing Remote Sensing and Digital Image Processing to Delineate the Structural Features in the Eastern Part of the Dead Sea, Jordan
- Perturbation Solution of the Jackson’s Dusty Gas Model Equations for Ternary Gaseous Systems
- On the Primacy of the Exchange Complex on the Shear Strength of Marly Soil
- Hydroponics Removal of Wastewater’s Contaminants for the Generation of Commercially Valuable Plants and Environmentally Sound Effluent for The Dead Sea Communities
Last modified: 2014-10-14 03:44:07