ResearchBib Share Your Research, Maximize Your Social Impacts
Sign for Notice Everyday Sign up >> Login

Effectiveness of Discussion of Technical Plan Document Building Building by Expert Building Team Building in Denpasar City

Journal: International Journal of Science and Research (IJSR) (Vol.7, No. 8)

Publication Date:

Authors : ; ; ;

Page : 710-713

Keywords : Effectiveness; technical plan documents; Building Expert Team;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

The Denpasar City Government views it as a necessity to regulate and control the pace of development and organize the layout of buildings and the face of the city so that there is a harmonious balance between open space and built space and the harmony of the city face with a cultural outlook. Whereas to guarantee the realization of certain buildings that meet administrative requirements and technical requirements of buildings in accordance with their functions in order to realize functional buildings, a Building Expert Team must be established which has the function of reviewing technical plan documents. To optimize services which in conjunction with Good Governance need to examine the effectiveness of the discussion in addition to reviewing the constraints faced and formulate the discussion of the Building Technical Plan Documents carried out by the Building Expert Team at the Public Works and Spatial Planning of Denpasar City. The program to be evaluated is structured based on the context, input, process, and product components. Research method with explanative quantitative descriptive using observation, questionnaires and documentation. This evaluative study was conducted on 45 respondents. There are four variables examined in this study, namely (1) variable contexts which include vision and mission, commitment, goals and quality, stakeholder quality, facilities and infrastructure, involvement of other parties, (2) input variables which include management, power support the program, expectations of stakeholders, funds and management, software, discussion environment (3) process variables which include planning, discussion procedures, implementation mechanisms, constraints and constraints, program explanation (4) product variables which include correction of documents and recommendations. From the analysis of each variable and transformed in the T-Score, the quality of the discussion of the Expert Building Team on the Building Technical Plan Document in the City of Denpasar is located in quadrant III (third) or quite effective.

Last modified: 2021-06-28 19:31:15