PERFORMANCE EVALUATION OF THE SOUAPITI HYDROELECTRIC POWER PLANT (APRIL-JUNE 2025) IN THE REPUBLIC OF GUINEA
Journal: International Journal of Advanced Research (Vol.14, No. 01)Publication Date: 2026-01-15
Authors : Mohamed Lamine Kourouma; Yacouba Camara;
Page : 1420-1423
Keywords : Souapiti hydraulic energy performance modelling flow rates PPA dam;
Abstract
This study models the operational performance of the Souapiti hydroelectric power plant (Guinea) over a three-month period, from April to June 2025
Other Latest Articles
- COMMUNITY PARTICIPATION IN THE IMPLEMENTATION OF MALARIA PREVENTION AND CONTROL PROGRAMS IN BOARDING SECONDARY SCHOOLS: A CASE STUDY OF KADUHA SECTOR, NYAMAGABE DISTRICT, RWANDA
- SCULPTING THE BONE: EXOSTOSIS REVEALED AND RESECTED
- VARIABILITY OF TOTAL ELECTRON CONTENT (TEC) DURING FOUR MAJOR GEOMAGNETIC STORMS OF 2012-2014: A MULTISITE ANALYSIS AT FIXED LONGITUDES
- EDUCATION AS TRANSFORMATION: BEYOND RANKINGS, METRICS AND MARKET LOGIC
- A COMPARATIVE STUDY EVALUATING THE SAFETY AND EFFICACY OF PARACETAMOL AND MEFENAMIC ACID IN FEBRILE CHILDREN
Last modified: 2026-02-14 15:50:29
Share Your Research, Maximize Your Social Impacts