Reactive Power Compensation in 132kv & 33kv Grid of Narsinghpur Area

Journal: International Journal of Computational Engineering Research(IJCER) (Vol.6, No. 6)

Publication Date:

Authors : ; ;

Page : 6-15

Keywords : Reactive power; Reactive compensation; Load flow study; Group shunt compensation; Voltage Regulation; Shunt Capacitors; Transmission losses; WATTS; VARS; Apparent Power (S);

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

Power Sector is considered to be very important and priority sector as it leads to overall development of country. The cost of installation of new generating units is rising; hence generated electrical energy has to be utilized carefully and efficiently, which changes through each AC cycle. It is proposed to study the effect of group shunt compensation provided for the mix of rural and urban loads, catered from grid sub-stations in the district of Narsinghpur, to assess its adequacy and saving in transmission losses. An optimum combination of compensators which yields maximum benefits in the system shall be worked out. Load Flow Study for the effect of group shunt compensation provided on 132KV bus of 220KV sub-station Narsinghpur and on 33KV buses of 132KV sub stations Srinagar, Narsinghpur, Gadarwara and Burman sub-stations for the mix of rural and urban loads, catered from partial grid network in Narsinghpur district. If reactive power is supplied near the load, the line current can be reduced or minimized, reducing power losses and improving voltage regulation at the load terminals. The leading current drawn by the shunt capacitors compensates the lagging current drawn by the load. The selection of shunt capacitors depends on many factors, the most important of which is the amount of lagging reactive power taken by the load. Objective was to study the effect of group shunt compensation provided for the mix of rural and urban loads, catered from grid sub-stations in the district of Narsinghpur and to assess the adequacy and saving in transmission losses & to work out an optimum combination of compensators which yields maximum benefits in the system. Depending on the stages of 'ON' and 'OFF', operations to be carried out in various permutations and combinations of shunt compensators i.e. switchable capacitor banks provided on 132 KV bus of 220KV substation Narsinghpur and on 33KV buses of 132 KV substations