ResearchBib Share Your Research, Maximize Your Social Impacts
Sign for Notice Everyday Sign up >> Login

RELABILITY OF IMPLEMENTING PRIMAVERA P6 IN FAST-TRACK PLANNING OF RESIDENTIAL BUILDING

Journal: International Journal of Civil Engineering and Technology (IJCIET) (Vol.8, No. 1)

Publication Date:

Authors : ; ; ;

Page : 245-256

Keywords : Fast-track planning; scheduling; resources; time; cost etc.;

Source : Downloadexternal Find it from : Google Scholarexternal

Abstract

To understanding the process of project planning in primavera p6 by using project calendar and develop the schedules. To control resources ex: - labour, non-labour, machines etc. Methodology: Site visits of ongoing projects and understanding the various tasks, plans and scheduling models, collection of project data, venture Planning and Scheduling by using Primavera P6, interpretation and tabulation of Results, conclusion. Findings: Analysis of results in primavera p6 observed that resources should be controlled are arranged to other activities of same project or another project of same enterprise. Controlled the budgeted units to control the project cost. Reliability of implementing primavera p6 it is more advantageous on ongoing parallel projects and it shows the results accurately. From the analysis observed that project time is over run due to following conventional method. Applications: This software is mainly used for getting more accurate and reliable results occurring in planning and scheduling, resource planning labour, nonlabour, material etc, mainly in coding tenders, to start multiple projects at same time, requirement of cash flows, labour, non-labour, and material for every month to start the project.

Last modified: 2017-02-18 19:03:11