RELABILITY OF IMPLEMENTING PRIMAVERA P6 IN FAST-TRACK PLANNING OF RESIDENTIAL BUILDING
Journal: International Journal of Civil Engineering and Technology (IJCIET) (Vol.8, No. 1)Publication Date: 2017-01-01
Authors : Jannu Saibabu; SS. Asadi; S.S. Bhanu Prakash;
Page : 245-256
Keywords : Fast-track planning; scheduling; resources; time; cost etc.;
Abstract
To understanding the process of project planning in primavera p6 by using project calendar and develop the schedules. To control resources ex: - labour, non-labour, machines etc. Methodology: Site visits of ongoing projects and understanding the various tasks, plans and scheduling models, collection of project data, venture Planning and Scheduling by using Primavera P6, interpretation and tabulation of Results, conclusion. Findings: Analysis of results in primavera p6 observed that resources should be controlled are arranged to other activities of same project or another project of same enterprise. Controlled the budgeted units to control the project cost. Reliability of implementing primavera p6 it is more advantageous on ongoing parallel projects and it shows the results accurately. From the analysis observed that project time is over run due to following conventional method. Applications: This software is mainly used for getting more accurate and reliable results occurring in planning and scheduling, resource planning labour, nonlabour, material etc, mainly in coding tenders, to start multiple projects at same time, requirement of cash flows, labour, non-labour, and material for every month to start the project.
Other Latest Articles
- STRESS ANALYSIS OF EXTERNAL FIXATOR BASED ON STAINLESS STEEL AND COMPOSITE MATERIAL
- EFFECT OF A TIP CLEARANCE ON THE PERFORMANCE OF A LOW SPEED CENTRIFUGAL COMPRESSOR
- STUDY ON SMART CITY TO TRANSFORM 23rd WARD OF VIJAYAWADA MUNICIPAL CORPORATION TO SMART WARDS
- STABILIZATION OF SOIL USING BIO-ENZYME
- INFLUENCE OF VIBRATORY WELD CONDITIONING ON HARDNESS OF LAP WELDED JOINTS
Last modified: 2017-02-18 19:03:11