OPTIMAL RESOURCES UTILIZATION IN CONSTRUCTION INDUSTRY
Journal: International Journal of Civil Engineering and Technology (IJCIET) (Vol.8, No. 1)Publication Date: 2017-01-01
Authors : J. RamaJogi; SS. Asadi;
Page : 273-280
Keywords : Resource Planning; Management; Resource wastage; Construction; Profitability;
Abstract
The main objective of the study is to discover the nature and degree of wastage, and to find out the various causes of wastage. To quantify the effects of wastage and to propose a technique for maximum utilization of resources. Resource planning and management is the most important factor for profitability and competitiveness in today's Indian construction industry. Construction projects are a bit typical to achieve due to time limitations and predetermined objective
Other Latest Articles
- BEHAVIOR TO DAMAGE OF TWO HARDENING PRECIPITATION COPPER ALLOYS: EXPERIMENTAL CHARACTERIZATION AND NUMERICAL STUDY
- SOLID WASTE MANAGEMENT THROUGH PUBLICPRIVATE PARTNERSHIP MODEL
- LOGISTICS CONTROL OVER MATERIALS OF METRO RAIL
- RELABILITY OF IMPLEMENTING PRIMAVERA P6 IN FAST-TRACK PLANNING OF RESIDENTIAL BUILDING
- STRESS ANALYSIS OF EXTERNAL FIXATOR BASED ON STAINLESS STEEL AND COMPOSITE MATERIAL
Last modified: 2017-02-18 19:10:21